Fillyaboots Article Archive
Home  List  Search

African Eagle Resources Drilling Update
Fillyaboots Articles

From: Nigel
ArtDate: 13th December 2006
Section: (FILLYABOOTS NEWS RELEASES)
Remote Name: 84.9.59.118
Date: 22/12/06
Time: 20:06

Comments

13th December 2006

African Eagle Resources Drilling Update

News Item - Conduit PR

AFRICAN EAGLE RESOURCES PLC DRILLING UPDATE FROM MKUSHI COPPER MINES PROJECT

Further positive drill results from the Mkushi Copper Mines Project in Zambia confirm the substantial width and grade of the deposit. Results include: 82.7m at 1.7% copper 66.1m at 1.0% copper Exploration drilling reveals a parallel copper mineralised zone at Munda Targets for future drill testing include 40 geophysical IP anomalies African Eagle Resources plc ("the Company", ticker: AIM: AFE) today announces further results from the feasibility study drill programme designed to add to the resource estimate at the Company's nearest production project, the Mkushi Copper Mines in central Zambia. Mineralised drill intercepts included:

82.7m at 1.7% copper 66.1m at 1.0% copper 31m at 0.98% copper 97m at 0.5% copper 36m at 0.97% copper 33m at 0.94% copper The Company is also pleased to announce results from exploration drilling recently completed at the Munda prospect, 4km southeast of H-Zone and the Munshiwemba open pit. This prospect has not previously been drilled. Mineralised drill intercepts from African Eagle's 6 hole test drilling programme included:

Edward Portman Conduit PR Ltd 76 Cannon St London EC4N 6AE Office: +44 (0) 20 7429 6666 Direct: +44 (0) 20 7429 6607 Fax: +44 (0) 20 7429 6699 Mob: +44 (0) 773 3363 501

www.conduitpr.com

Copyright © Fillyaboots.com 2000 - 2008 All Rights Reserved